buildpoint usa logo

612.427.3615

The Bar Method

image of the bar method

The performance by you and your associates has been outstanding on every level as well as your professionalism and understanding to our needs. We know franchise systems are not always easy, so we value our partnership and appreciate all you do for our brands.

–Pete Storlie, Sr. Construction Manager

Thinking outside the box to solve challenges

Many times, contractors are faced with seemingly impossible challenges. While constructing a Bar Method fitness facility located on the second floor of a shopping center, we met a challenge when the full-length mirrors couldn’t be carried up the low-clearance stairway. With no way to navigate the mirrors up the stairs, we had to think outside the box to get them inside.

We worked with our general contractor to form a solution. With the help of a forklift, we raised the mirrors one by one to the second floor and carefully lifted them over the handrail surrounding the outdoor second-floor landing. This process was repeated when the front desk also couldn’t be carried up the stairs.

Always conscious of our client’s budgets, we were able to avoid a change order to accommodate the extra labor. We’re supported by great contractors that go the extra mile to ensure jobs are completed with little to no cost added.